Path tracer for Solid edge was developed for Solid edge ST7.
The program currently only runs in the drafting environment and expects at least one point to track.
  1. Select a variable or dimension to be used to drive motion.
  2. The initial value will be used as the maximum or the minimum range.
  3. Set a value for the limit of the range of the variable or dimension.
  4. Set a step value. Step value determines how accurate the curve is.
  5. Test the motion with the slider.
  6. Process to create the curve paths.

Last edited Feb 12, 2015 at 7:08 PM by jtitcomb, version 3